This is the Taxi Way (2nd Runway) at Akwa Ibom International Airport constructed by Governor Udom Emmanuel. Post navigation Previous ServiceDualized Eket – Ibeno Road Next ServiceConstruction of Bassey Lane Road in Oron L.G.A
Construction of 3.32km Sampson Udo Idiong Drive. (ring road 2) Construction of 3.32km Sampson Udo Idiong Drive. (ring road 2)
Dualization Of Uyo Airport-Okopedi Okobo Road, Phase 1 Dualization Of Uyo Airport-Okopedi Okobo Road, Phase 1
Construction of 6.64km Ring Road 2, along Abak and Aka roads in Uyo L.G.A Construction of 6.64km Ring Road 2, along Abak and Aka roads in Uyo L.G.A